Testing Of Red Line Of The Battlestar Galacticaâ?¢ Dueling Coasters At Universal Studios Singapore

If you're new here, you may want to subscribe to my RSS feed. Thanks for visiting!


Testing of Red Line of the Battlestar Galacticaâ?¢ dueling coasters at Universal Studios Singapore taken on Nov. 12th 2009. For more updates and information go to http://sentosathemepark. blo. . .

 Mail this post

Technorati Tags: , , , , , , , ,

10 comments ↓

#1 Bigbearsg on 11.23.09 at 1:19 pm

Go to my web site for video of Both Red and Blue Line test at once

#2 dakomon on 11.23.09 at 1:22 pm

ah i see…. well, it’s not good idea to slow it down more. Many people will be pissed off by that and may not return back again in future.

#3 iilluuvvmmll on 11.23.09 at 1:59 pm

You might never know, the feeling when you are on the coaster is a lot faster from what it looks below.If I’m not wrong, one is 4Gs and the other one is -2Gs right?

#4 dakomon on 11.23.09 at 2:30 pm

slow it down more? what you mean?

#5 Bigbearsg on 11.23.09 at 2:34 pm

if it’s now at about 1 min 10 sec on video then they are going to slow it down if it’s going to be 1 min 30 sec. But they could be saying that with loading and unload total time is 90 sec. Who know till they open.

#6 dakomon on 11.23.09 at 3:06 pm

It’s a test run mates. The actual run will be faster than what you see on this video. But I am worried for the time duration, If very fast, it’ll be less than 1 min.

#7 Bigbearsg on 11.23.09 at 3:56 pm

Resorts World at Sentosa just said on there face book page that the ride will be 90 sec long sound like they are slow it down more.

#8 zoeyrawkz on 11.23.09 at 4:12 pm

They have a facebook page? o_O

#9 iilluuvvmmll on 11.23.09 at 4:15 pm

Hope that you could take a snap on the Cylon Track soon, they have started their test run on it. =)

#10 iilluuvvmmll on 11.23.09 at 4:53 pm

The coaster are being “launched” from the stations, not chain lift.

Leave a Comment

Powered by WP Hashcash